PROJECT OVERVIEW
This approximately 26-mile project, running from the Ladysmith Substation in Caroline County to the Elmont Substation in Hanover County, will replace over 100, 500-kilovolt weathering steel lattice structures. Although the existing structures have been well maintained since their construction in the 1960s, continued operation risks negative impacts to electric service reliability in the area. New structures will be approximately 35 feet taller on average than existing structures, and will be galvanized steel that is pre-dulled to reduce initial galvanized sheen. The proposed structures will be built in approximately the same locations as existing structures and the current project design will not require new, permanent rights-of-way. The target completion date for this project is December 2025.