Southline-Jacinto 138 kV Transmission Line Project

Scroll down

Interactive map

  • 0
  • icon
  • 0
  • icon

All routes and route segments included in the notice of the Certificate of Convenience and Necessity (CCN) application filing will be available for selection and approval by the PUCT. Only one route utilizing a forward progressing end-to-end combination of alternative segments will ultimately be selected and approved by the Public Utility Commission of Texas (PUCT) for construction.

Data layers such as parcel boundaries are obtained from third-party sources and may vary from the actual boundaries. Digitization of preliminary alternative segments and the approximate right-of-way is based on interpretation of these features and aerial photography. Once an alternative route is selected and approved by the PUCT, the represented centerline and approximate right-of-way is subject to modification based on ground surveys and detailed engineering design.

Additional Project Information

Typical Construction Process

The graphics below are demonstrative examples of a typical construction scenario and configuration. Scenarios may vary by line segment.

Existing
Clearing
Foundations
Staging
Structure Lowering
Stringing
Line Complete
Restoration
Right-of-Way